United States βΊ Grid βΊ Interconnection queues βΊ Nebraska
ONSHORE WIND Β· SPPOnshore wind project GEN-2010-041, Richardson County
Onshore wind project GEN-2010-041, Richardson County is a 10.3 MW onshore wind request withdrawn in the SPP interconnection queue, in Richardson County, Nebraska, connecting to OPPD.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2010 (completed)
- Withdrawn / abandonedMay 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- OperatingDec 2015 (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2010-041
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- OPPD
- Connection point (POI)
- S1399 161kV
- Location
- Richardson County, Nebraska
- Technology
- Wind: 10.3 MW
- Total requested
- 10.3 MW
- Service type
- Energy only (ERIS)
- Study phase
- TERMINATED
- Queue status
- Withdrawn
- Entered queue
- 24 September 2010
- Proposed online date
- December 2015
- Came online
- December 2015
- Withdrawn
- May 2019
Location
Marker shows the centre of Richardson County; the queue data does not give exact sites.
Other requests in Richardson County
- Other project GEN-2024-231, Richardson CountyOther Β· 65.0 MW Β· in study
- Onshore wind project GEN-2008-119O, Richardson CountyOnshore wind Β· 60.0 MW Β· built
- Onshore wind project GEN-2010-035, Richardson CountyOnshore wind Β· 160 MW Β· withdrawn
- Battery storage project GEN-2022-152, Richardson CountyBattery storage Β· 80.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem