United States › Grid › Interconnection queues › Florida
SOLAR · SOUTHEASTSolar project 378G, Walton County
Solar project 378G, Walton County is a 74.5 MW solar request built and operating in the Southeast interconnection queue, in Walton County, Florida, connecting to Florida Power & Light.
Request details
- Queue ID
- 378G
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Florida Power & Light
- Developer
- FPL
- Connection point (POI)
- Shoal River - Pinckard (APC) 230kV line
- Location
- Walton County, Florida
- Technology
- Solar: 74.5 MW
- Total requested
- 74.5 MW
- Service type
- Network resource (NRIS)
- Study phase
- IA Executed
- Queue status
- Operational
- Entered queue
- 5 February 2020
- Proposed online date
- March 2024
- Came online
- March 2024
Location
Marker shows the centre of Walton County; the queue data does not give exact sites.
Other requests in Walton County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem