United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTLucas Solar SLF
Lucas Solar SLF is a 204 MW solar request withdrawn in the ERCOT interconnection queue, in Goliad County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2022 (completed)
- Withdrawn / abandonedMay 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 24INR0384
- Grid region
- ERCOT (Texas)
- Developer
- Clip Road Solar LLC
- Connection point (POI)
- TAP 69 KV LINE FROM BERCLAIR 8586 - GOLIAD 8587
- Location
- Goliad County, Texas
- Technology
- Solar: 204 MW
- Total requested
- 204 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 24 July 2022
- Proposed online date
- August 2025
- Withdrawn
- May 2024
Location
Marker shows the centre of Goliad County; the queue data does not give exact sites.
Other requests in Goliad County
- Tulsita SolarSolar Β· 256 MW Β· agreement signed
- Keys Hollow Solar Phase II SLFSolar + storage Β· 204 MW Β· agreement signed
- Keys Hollow Solar SLFSolar + storage Β· 204 MW Β· agreement signed
- Coleto Creek - Fuel Change OnlyGas Β· 655 MW Β· in study
- Diablo Campo StorageBattery storage Β· 314 MW Β· in study
- Kuy Creek Solar 1 SLFSolar + storage Β· 235 MW Β· in study
- Angel City SolarSolar Β· 221 MW Β· in study
- Eighteenmile Solar SLFSolar + storage Β· 153 MW Β· in study
- Kuy Creek Storage 1 SLFSolar + storage Β· 152 MW Β· in study
- Peregrine BESSSolar + storage Β· 150 MW Β· in study
- Peregrine BESS 2Solar + storage Β· 150 MW Β· in study
- Double A Solar SLFSolar + storage Β· 133 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem