Lucas Solar SLF

Lucas Solar SLF is a 204 MW solar request withdrawn in the ERCOT interconnection queue, in Goliad County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2022 (completed)
  2. Withdrawn / abandonedMay 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
24INR0384
Grid region
ERCOT (Texas)
Developer
Clip Road Solar LLC
Connection point (POI)
TAP 69 KV LINE FROM BERCLAIR 8586 - GOLIAD 8587
Location
Goliad County, Texas
Technology
Solar: 204 MW
Total requested
204 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
24 July 2022
Proposed online date
August 2025
Withdrawn
May 2024

Location

Marker shows the centre of Goliad County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Goliad County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem