ONSHORE WIND Β· MISO

Onshore wind project J323, St. Mary Parish County

Onshore wind project J323, St. Mary Parish County is a 19.8 MW onshore wind request withdrawn in the MISO interconnection queue, in St. Mary Parish County, Louisiana.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2014 (completed)
  2. Withdrawn / abandonedAug 2015 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J323
Grid region
MISO (Midcontinent)
Connection point (POI)
Ivanhoe Substation
Location
St. Mary Parish County, Louisiana
Technology
Wind: 19.8 MW
Total requested
19.8 MW
Study phase
Feasibility
Queue status
Withdrawn
Entered queue
14 January 2014
Withdrawn
August 2015

Location

Marker shows the centre of St. Mary Parish County; the queue data does not give exact sites.

Power plants in Louisiana Β· Transmission lines in Louisiana

Other requests in St. Mary Parish County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem