ONSHORE WIND Β· MISOOnshore wind project J323, St. Mary Parish County
Onshore wind project J323, St. Mary Parish County is a 19.8 MW onshore wind request withdrawn in the MISO interconnection queue, in St. Mary Parish County, Louisiana.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2014 (completed)
- Withdrawn / abandonedAug 2015 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J323
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Ivanhoe Substation
- Location
- St. Mary Parish County, Louisiana
- Technology
- Wind: 19.8 MW
- Total requested
- 19.8 MW
- Study phase
- Feasibility
- Queue status
- Withdrawn
- Entered queue
- 14 January 2014
- Withdrawn
- August 2015
Location
Marker shows the centre of St. Mary Parish County; the queue data does not give exact sites.
Power plants in Louisiana Β· Transmission lines in Louisiana
Other requests in St. Mary Parish County
- Solar project J1367, St. Mary Parish CountySolar Β· 95.0 MW Β· under construction
- Other project J1247, St. Mary Parish CountyOther Β· 17.0 MW Β· under construction
- Gas project J373, St. Mary Parish CountyGas Β· 71.5 MW Β· built
- Solar project J1455, St. Mary Parish CountySolar Β· 150 MW Β· withdrawn
- Solar project J1788, St. Mary Parish CountySolar Β· 120 MW Β· withdrawn
- Solar project J2191, St. Mary Parish CountySolar Β· 100 MW Β· withdrawn
- Onshore wind project J699, St. Mary Parish CountyOnshore wind Β· 48.3 MW Β· withdrawn
- Other project J465, St. Mary Parish CountyOther Β· 44.1 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem