United States βΊ Grid βΊ Interconnection queues βΊ Louisiana
OTHER Β· MISOOther project J465, St. Mary Parish County
Other project J465, St. Mary Parish County is a 44.1 MW other request withdrawn in the MISO interconnection queue, in St. Mary Parish County, Louisiana.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2015 (completed)
- Withdrawn / abandonedJun 2016 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- OperatingDec 2019 (not reached)
- Closed (not reached)
Request details
- Queue ID
- J465
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- North Bend 138 kV Substation
- Location
- St. Mary Parish County, Louisiana
- Technology
- Other: 44.1 MW
- Total requested
- 44.1 MW
- Study phase
- Int FaS
- Queue status
- Withdrawn
- Entered queue
- 18 May 2015
- Proposed online date
- October 2017
- Came online
- December 2019
- Withdrawn
- June 2016
Location
Marker shows the centre of St. Mary Parish County; the queue data does not give exact sites.
Power plants in Louisiana Β· Transmission lines in Louisiana
Other requests in St. Mary Parish County
- Solar project J1367, St. Mary Parish CountySolar Β· 95.0 MW Β· under construction
- Other project J1247, St. Mary Parish CountyOther Β· 17.0 MW Β· under construction
- Gas project J373, St. Mary Parish CountyGas Β· 71.5 MW Β· built
- Solar project J1455, St. Mary Parish CountySolar Β· 150 MW Β· withdrawn
- Solar project J1788, St. Mary Parish CountySolar Β· 120 MW Β· withdrawn
- Solar project J2191, St. Mary Parish CountySolar Β· 100 MW Β· withdrawn
- Onshore wind project J699, St. Mary Parish CountyOnshore wind Β· 48.3 MW Β· withdrawn
- Onshore wind project J323, St. Mary Parish CountyOnshore wind Β· 19.8 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem