Solar project LGE-GIS-2022-001, Ballard County

Solar project LGE-GIS-2022-001, Ballard County is a 125 MW solar request withdrawn in the Southeast interconnection queue, in Ballard County, Kentucky, connecting to Louisville Gas & Electric and Kentucky Utilities Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2022 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
LGE-GIS-2022-001
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Louisville Gas & Electric and Kentucky Utilities Energy
Connection point (POI)
Grahamville β€šΓ„Γ¬ Wickliffe 161 kV line
Location
Ballard County, Kentucky
Technology
Solar: 125 MW
Total requested
125 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
17 February 2022
Proposed online date
September 2026

Location

Marker shows the centre of Ballard County; the queue data does not give exact sites.

Power plants in Kentucky Β· Transmission lines in Kentucky

Other requests in Ballard County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem