United States βΊ Grid βΊ Interconnection queues βΊ Kentucky
SOLAR Β· SOUTHEASTSolar project LGE-GIS-2019-002, Ballard County
Solar project LGE-GIS-2019-002, Ballard County is a 104 MW solar request withdrawn in the Southeast interconnection queue, in Ballard County, Kentucky, connecting to Louisville Gas & Electric and Kentucky Utilities Energy.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2019 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- LGE-GIS-2019-002
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Louisville Gas & Electric and Kentucky Utilities Energy
- Connection point (POI)
- Grahamville βΓΓ¬ Wickliffe 161 kV Line
- Location
- Ballard County, Kentucky
- Technology
- Solar: 104 MW
- Total requested
- 104 MW
- Service type
- Network resource (NRIS)
- Study phase
- LGIA terminated
- Queue status
- Withdrawn
- Entered queue
- 6 February 2019
- Proposed online date
- September 2026
Location
Marker shows the centre of Ballard County; the queue data does not give exact sites.
Other requests in Ballard County
- Solar project LGE-CS2025-013, Ballard CountySolar Β· 100 MW Β· in study
- Solar project LGE-GIS-2022-001, Ballard CountySolar Β· 125 MW Β· withdrawn
- Solar project LGE-GIS-2019-014, Ballard CountySolar Β· 100 MW Β· withdrawn
- Solar project LGE-GIS-2019-021, Ballard CountySolar Β· 80.0 MW Β· withdrawn
- Other project G508, Ballard CountyOther Β· 15.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem