πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί New Jersey

SOLAR + STORAGE Β· PJM

Solar + storage project AE2-085, Burlington County

Solar + storage project AE2-085, Burlington County is a 5.0 MW solar + storage request withdrawn in the PJM interconnection queue, in Burlington County, New Jersey, connecting to PSEG.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2019 (completed)
  2. Withdrawn / abandonedAug 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AE2-085
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
PSEG
Connection point (POI)
Southampton 13.2 kV
Location
Burlington County, New Jersey
Technology
Solar: 5.0 MW Β· Battery
Total requested
5.0 MW
Service type
Energy only (ERIS)
Study phase
Available studies: Feasibility Study
Queue status
Withdrawn
Entered queue
22 February 2019
Proposed online date
March 2020
Withdrawn
August 2019

Location

Marker shows the centre of Burlington County; the queue data does not give exact sites.

Power plants in New Jersey Β· Transmission lines in New Jersey

Other requests in Burlington County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem