BATTERY STORAGE · PJMNew Creek Mountain Energy Storage
New Creek Mountain Energy Storage is a 32.0 MW battery storage request withdrawn in the PJM interconnection queue, in Grant County, West Virginia, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2010 (completed)
- Withdrawn / abandonedNov 2018 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- OperatingDec 2016 (not reached)
- Closed (not reached)
Request details
- Queue ID
- W4-037
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Bismark 500kV
- Location
- Grant County, West Virginia
- Technology
- Battery: 32.0 MW
- Total requested
- 32.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Withdrawn
- Entered queue
- 30 December 2010
- Proposed online date
- December 2018
- Came online
- December 2016
- Withdrawn
- November 2018
Location
Marker shows the centre of Grant County; the queue data does not give exact sites.
Power plants in West Virginia · Transmission lines in West Virginia
Other requests in Grant County
- Onshore wind project AG2-062, Grant CountyOnshore wind · 147 MW · in study
- Greenland Gap WFOnshore wind · 300 MW · built
- Greenland Gap WFOnshore wind · 60.0 MW · built
- Mount Storm Unit 2Coal · 38.0 MW · built
- Mount Storm Unit 1Coal · 38.0 MW · built
- Solar project AG2-655, Grant CountySolar · 500 MW · withdrawn
- Other project AI1-202, Grant CountyOther · 450 MW · withdrawn
- Battery storage project AH1-256, Grant CountyBattery storage · 240 MW · withdrawn
- Mount Storm Repower BESS 1Battery storage · 240 MW · withdrawn
- Onshore wind project X3-036, Grant CountyOnshore wind · 150 MW · withdrawn
- Mt. Storm Wind ForceOnshore wind · 150 MW · withdrawn
- Onshore wind project H04_W64, Grant CountyOnshore wind · 150 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem