United States βΊ Grid βΊ Interconnection queues βΊ Louisiana
BATTERY STORAGE Β· MISOBattery storage project J2424, Evangeline Parish County
Battery storage project J2424, Evangeline Parish County is a 100 MW battery storage request withdrawn in the MISO interconnection queue, in Evangeline Parish County, Louisiana, connecting to CLECO POWER.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedJul 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2424
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- CLECO POWER
- Connection point (POI)
- Manuel 138kV
- Location
- Evangeline Parish County, Louisiana
- Technology
- Battery: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 13 September 2022
- Proposed online date
- October 2026
- Withdrawn
- July 2025
Location
Marker shows the centre of Evangeline Parish County; the queue data does not give exact sites.
Power plants in Louisiana Β· Transmission lines in Louisiana
Other requests in Evangeline Parish County
- Solar project J1286, Evangeline Parish CountySolar Β· 150 MW Β· under construction
- Solar project J2322, Evangeline Parish CountySolar Β· 200 MW Β· in study
- Solar + storage project J1686, Evangeline Parish CountySolar + storage Β· 100 MW Β· in study
- Solar project J1384, Evangeline Parish CountySolar Β· 200 MW Β· withdrawn
- Solar project J2135, Evangeline Parish CountySolar Β· 200 MW Β· withdrawn
- Solar project J3238, Evangeline Parish CountySolar Β· 155 MW Β· withdrawn
- Solar project J1796, Evangeline Parish CountySolar Β· 150 MW Β· withdrawn
- Solar project J2467, Evangeline Parish CountySolar Β· 105 MW Β· withdrawn
- Battery storage project J1908, Evangeline Parish CountyBattery storage Β· 100 MW Β· withdrawn
- Solar project J2257, Evangeline Parish CountySolar Β· 80.0 MW Β· withdrawn
- Battery storage project J1290, Evangeline Parish CountyBattery storage Β· 25.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem