SOLAR Β· MISOSolar project J1140, Benton County
Solar project J1140, Benton County is a 80.0 MW solar request withdrawn in the MISO interconnection queue, in Benton County, Minnesota, connecting to MINNESOTA POWER.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2018 (completed)
- Withdrawn / abandonedMar 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1140
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- MINNESOTA POWER
- Connection point (POI)
- Platte River 115 kV Substation
- Location
- Benton County, Minnesota
- Technology
- Solar: 80.0 MW
- Total requested
- 80.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 12 March 2018
- Proposed online date
- August 2020
- Withdrawn
- March 2021
Location
Marker shows the centre of Benton County; the queue data does not give exact sites.
Power plants in Minnesota Β· Transmission lines in Minnesota
Other requests in Benton County
- Solar project J1445, Benton CountySolar Β· 100 MW Β· under construction
- Solar project J1426, Benton CountySolar Β· 100 MW Β· under construction
- Benton Energy Storage IIBattery storage Β· 310 MW Β· in study
- Solar project J4132, Benton CountySolar Β· 304 MW Β· in study
- Solar project J3884, Benton CountySolar Β· 300 MW Β· in study
- Battery storage project J3235, Benton CountyBattery storage Β· 250 MW Β· in study
- Onshore wind project J3275, Benton CountyOnshore wind Β· 249 MW Β· in study
- Benton Solar IISolar Β· 106 MW Β· in study
- Surplus; J1426Battery storage Β· 100 MW Β· in study
- replacing 100MW of un-built solar with BESS; MayhewOther Β· 100 MW Β· in study
- Solar project J2495, Benton CountySolar Β· 100 MW Β· in study
- Onshore wind project G897, Benton CountyOnshore wind Β· 1,500 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem