United States › Grid › Interconnection queues › Minnesota
ONSHORE WIND · MISOOnshore wind project J3275, Benton County
Onshore wind project J3275, Benton County is a 249 MW onshore wind request in interconnection study in the MISO interconnection queue, in Benton County, Minnesota, connecting to GREAT RIVER ENERGY.
Queue statusIn planning
- PlanningQueued Apr 2024 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Sep 2028 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- J3275
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- GREAT RIVER ENERGY
- Connection point (POI)
- Mud Lake - Benton County (GRE) 230kV
- Location
- Benton County, Minnesota
- Technology
- Wind: 249 MW
- Total requested
- 249 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 1
- Queue status
- Active
- Entered queue
- 17 April 2024
- Proposed online date
- September 2028
Location
Marker shows the centre of Benton County; the queue data does not give exact sites.
Other requests in Benton County
- Solar project J1445, Benton CountySolar · 100 MW · under construction
- Solar project J1426, Benton CountySolar · 100 MW · under construction
- Benton Energy Storage IIBattery storage · 310 MW · in study
- Solar project J4132, Benton CountySolar · 304 MW · in study
- Solar project J3884, Benton CountySolar · 300 MW · in study
- Battery storage project J3235, Benton CountyBattery storage · 250 MW · in study
- Benton Solar IISolar · 106 MW · in study
- Surplus; J1426Battery storage · 100 MW · in study
- replacing 100MW of un-built solar with BESS; MayhewOther · 100 MW · in study
- Solar project J2495, Benton CountySolar · 100 MW · in study
- Onshore wind project G897, Benton CountyOnshore wind · 1,500 MW · withdrawn
- Onshore wind project G898, Benton CountyOnshore wind · 1,500 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem