πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί New York

OTHER Β· NYISO

Onondaga Renewables

Onondaga Renewables is a 47.0 MW other request withdrawn in the NYISO interconnection queue, in Onondaga County, New York, connecting to NM-NG.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2008 (completed)
  2. Withdrawn / abandonedJan 2012 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
315
Grid region
NYISO (New York)
Utility / transmission owner
NM-NG
Developer
CRC Renewables, LLC
Connection point (POI)
Geres Lock 115kV
Location
Onondaga County, New York
Technology
Other: 47.0 MW
Total requested
47.0 MW
Queue status
Withdrawn
Entered queue
23 October 2008
Withdrawn
January 2012

Location

Marker shows the centre of Onondaga County; the queue data does not give exact sites.

Power plants in New York Β· Transmission lines in New York

Other requests in Onondaga County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem