United States βΊ Grid βΊ Interconnection queues βΊ Louisiana
SOLAR Β· MISOSolar project J516, St. James Parish County
Solar project J516, St. James Parish County is a 100 MW solar request withdrawn in the MISO interconnection queue, in St. James Parish County, Louisiana.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2015 (completed)
- Withdrawn / abandonedMay 2017 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J516
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Vacherie Substation 230kV
- Location
- St. James Parish County, Louisiana
- Technology
- Solar: 100 MW
- Total requested
- 100 MW
- Study phase
- GIA
- Queue status
- Withdrawn
- Entered queue
- 16 November 2015
- Proposed online date
- November 2017
- Withdrawn
- May 2017
Location
Marker shows the centre of St. James Parish County; the queue data does not give exact sites.
Power plants in Louisiana Β· Transmission lines in Louisiana
Other requests in St. James Parish County
- Solar project J1076, St. James Parish CountySolar Β· 200 MW Β· under construction
- Solar project J1158, St. James Parish CountySolar Β· 70.0 MW Β· under construction
- Solar project J1431, St. James Parish CountySolar Β· 200 MW Β· agreement signed
- Solar project J1542, St. James Parish CountySolar Β· 135 MW Β· agreement signed
- Solar project J1142, St. James Parish CountySolar Β· 20.0 MW Β· built
- Solar project J2025, St. James Parish CountySolar Β· 95.0 MW Β· withdrawn
- Battery storage project J2109, St. James Parish CountyBattery storage Β· 25.0 MW Β· withdrawn
- Other project J3765, St. James Parish CountyOther Β· 8.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem