πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Missouri

ONSHORE WIND Β· SPP

Onshore wind project GEN-2006-017, Nodaway County

Onshore wind project GEN-2006-017, Nodaway County is a 300 MW onshore wind request withdrawn in the SPP interconnection queue, in Nodaway County, Missouri, connecting to MIPU.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2006 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2006-017
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
MIPU
Connection point (POI)
Tap Maryville - Midway 161kV (GEN-2006-014 TAP)
Location
Nodaway County, Missouri
Technology
Wind: 300 MW
Total requested
300 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
2 June 2006
Proposed online date
April 2008

Location

Marker shows the centre of Nodaway County; the queue data does not give exact sites.

Power plants in Missouri Β· Transmission lines in Missouri

Other requests in Nodaway County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem