ONSHORE WIND · PJMHighland III Wind Farm
Highland III Wind Farm is a 50.0 MW onshore wind request withdrawn in the PJM interconnection queue, in Cambria County, Pennsylvania, connecting to PENELEC.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2011 (completed)
- Withdrawn / abandonedNov 2016 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- X2-031
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PENELEC
- Connection point (POI)
- Krayn 115kV
- Location
- Cambria County, Pennsylvania
- Technology
- Wind: 50.0 MW
- Total requested
- 50.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Withdrawn
- Entered queue
- 31 May 2011
- Proposed online date
- December 2015
- Withdrawn
- November 2016
Location
Marker shows the centre of Cambria County; the queue data does not give exact sites.
Power plants in Pennsylvania · Transmission lines in Pennsylvania
Other requests in Cambria County
- Solar + storage project AI2-446, Cambria CountySolar + storage · 150 MW · in study
- Battery storage project AJ1-016, Cambria CountyBattery storage · 100 MW · in study
- Solar + storage project AI1-179, Cambria CountySolar + storage · 100 MW · in study
- Solar project AH2-116, Cambria CountySolar · 85.0 MW · in study
- Onshore wind project AH2-247, Cambria CountyOnshore wind · 83.3 MW · in study
- Onshore wind project AH2-248, Cambria CountyOnshore wind · 83.3 MW · in study
- Onshore wind project AH2-403, Cambria CountyOnshore wind · 83.3 MW · in study
- Onshore wind project AH2-292, Cambria CountyOnshore wind · 77.0 MW · in study
- Maple Hill-Fiddlers 1 SP (Bear Rock)Solar · 50.0 MW · in study
- Solar project AH2-320, Cambria CountySolar · 10.0 MW · in study
- Solar + storage project AI1-114, Cambria CountySolar + storage · 9.9 MW · in study
- CPV Fairview Energy CenterGas · 1,050 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem