United States βΊ Grid βΊ Interconnection queues βΊ North Dakota
ONSHORE WIND Β· MISOOnshore wind project J1109, Cass County
Onshore wind project J1109, Cass County is a 207 MW onshore wind request withdrawn in the MISO interconnection queue, in Cass County, North Dakota, connecting to NORTHERN STATES POWER COMPANY.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2018 (completed)
- Withdrawn / abandonedMar 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1109
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- NORTHERN STATES POWER COMPANY
- Connection point (POI)
- Bison 345kV Substation
- Location
- Cass County, North Dakota
- Technology
- Wind: 207 MW
- Total requested
- 207 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 12 March 2018
- Proposed online date
- August 2021
- Withdrawn
- March 2020
Location
Marker shows the centre of Cass County; the queue data does not give exact sites.
Power plants in North Dakota Β· Transmission lines in North Dakota
Other requests in Cass County
- Solar + storage project J4105, Cass CountySolar + storage Β· 500 MW Β· in study
- Solar + storage project J4106, Cass CountySolar + storage Β· 500 MW Β· in study
- Other project J3163, Cass CountyOther Β· 479 MW Β· in study
- Solar project J1588, Cass CountySolar Β· 200 MW Β· in study
- Solar project J3522, Cass CountySolar Β· 200 MW Β· in study
- Onshore wind project J3833, Cass CountyOnshore wind Β· 200 MW Β· in study
- Surplus; J1588Battery storage Β· 200 MW Β· in study
- Onshore wind project MPC00500, Cass CountyOnshore wind Β· 379 MW Β· built
- Onshore wind project MPC01200, Cass CountyOnshore wind Β· 49.6 MW Β· built
- Other project G067, Cass CountyOther Β· 2.0 MW Β· built
- Gas project J494, Cass CountyGas Β· 484 MW Β· withdrawn
- Onshore wind project J1613, Cass CountyOnshore wind Β· 400 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem