Onshore wind project J3483, Champaign County

Onshore wind project J3483, Champaign County is a 137 MW onshore wind request withdrawn in the MISO interconnection queue, in Champaign County, Illinois, connecting to AMEREN ILLINOIS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2024 (completed)
  2. Withdrawn / abandonedSep 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J3483
Grid region
MISO (Midcontinent)
Utility / transmission owner
AMEREN ILLINOIS
Connection point (POI)
4RANTOUL - 4RISING 138.0kV
Location
Champaign County, Illinois
Technology
Wind: 137 MW
Total requested
137 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 1; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
16 April 2024
Proposed online date
March 2027
Withdrawn
September 2024

Location

Marker shows the centre of Champaign County; the queue data does not give exact sites.

Power plants in Illinois Β· Transmission lines in Illinois

Other requests in Champaign County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem