United States › Grid › Interconnection queues › Wisconsin

BATTERY STORAGE · MISO

Surplus; ALTE.QUILTBLCK

Surplus; ALTE.QUILTBLCK is a 98.0 MW battery storage request in interconnection study in the MISO interconnection queue, in Lafayette County, Wisconsin, connecting to AMERICAN TRANSMISSION COMPANY.

Queue statusIn planning
  1. PlanningQueued Mar 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Sep 2027 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
S1092
Grid region
MISO (Midcontinent)
Utility / transmission owner
AMERICAN TRANSMISSION COMPANY
Connection point (POI)
Falcon
Location
Lafayette County, Wisconsin
Technology
Battery: 98.0 MW
Total requested
98.0 MW
Queue status
Active
Entered queue
4 March 2025
Proposed online date
September 2027

Location

Marker shows the centre of Lafayette County; the queue data does not give exact sites.

Power plants in Wisconsin · Transmission lines in Wisconsin

Other requests in Lafayette County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem