ONSHORE WIND · WEST

105MW McNary-Roundup

105MW McNary-Roundup is a 105 MW onshore wind request withdrawn in the West interconnection queue, in Umatilla County, Oregon, connecting to Seawest Windpower, Inc..

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2001 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G58
Grid region
West (non-ISO utilities)
Utility / transmission owner
Seawest Windpower, Inc.
Developer
Seawest Windpower, Inc.
Connection point (POI)
McNary-Roundup 230 kV line
Location
Umatilla County, Oregon
Technology
Wind: 105 MW
Total requested
105 MW
Service type
Energy only (ERIS)
Queue status
Withdrawn
Entered queue
23 May 2001
Proposed online date
September 2003

Location

Marker shows the centre of Umatilla County; the queue data does not give exact sites.

Power plants in Oregon · Transmission lines in Oregon

Other requests in Umatilla County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem