πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

ONSHORE WIND Β· SPP

Onshore wind project GEN-2014-038, Hansford County

Onshore wind project GEN-2014-038, Hansford County is a 200 MW onshore wind request withdrawn in the SPP interconnection queue, in Hansford County, Texas, connecting to SPS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2014 (completed)
  2. Withdrawn / abandonedMar 2016 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2014-038
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
SPS
Connection point (POI)
Tap Hitchland β€šΓ„Γ¬ Potter County 345 kV
Location
Hansford County, Texas
Technology
Wind: 200 MW
Total requested
200 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
30 September 2014
Proposed online date
September 2017
Withdrawn
March 2016

Location

Marker shows the centre of Hansford County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Hansford County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem