United States β€Ί Grid β€Ί Interconnection queues β€Ί Mississippi

SOLAR + STORAGE Β· MISO

Solar + storage project J3108, Jasper County

Solar + storage project J3108, Jasper County is a 180 MW solar + storage request withdrawn in the MISO interconnection queue, in Jasper County, Mississippi, connecting to COOPERATIVE ENERGY.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2022 (completed)
  2. Withdrawn / abandonedJul 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J3108
Grid region
MISO (Midcontinent)
Utility / transmission owner
COOPERATIVE ENERGY
Connection point (POI)
Missionary 161kV Substation
Location
Jasper County, Mississippi
Technology
Solar: 180 MW Β· Battery
Total requested
180 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 2; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
15 September 2022
Proposed online date
June 2026
Withdrawn
July 2025

Location

Marker shows the centre of Jasper County; the queue data does not give exact sites.

Power plants in Mississippi Β· Transmission lines in Mississippi

Other requests in Jasper County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem