BATTERY STORAGE Β· MISOBattery storage project J749, Gratiot County
Battery storage project J749, Gratiot County is a 20.0 MW battery storage request withdrawn in the MISO interconnection queue, in Gratiot County, Michigan, connecting to METC.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2016 (completed)
- Withdrawn / abandonedMay 2018 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J749
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- METC
- Connection point (POI)
- Redstone 138 kV Substation
- Location
- Gratiot County, Michigan
- Technology
- Battery: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 14 November 2016
- Proposed online date
- September 2018
- Withdrawn
- May 2018
Location
Marker shows the centre of Gratiot County; the queue data does not give exact sites.
Other requests in Gratiot County
- Onshore wind project J984, Gratiot CountyOnshore wind Β· 200 MW Β· under construction
- Surplus; Polaris SolarOther Β· 100 MW Β· agreement signed
- Surplus; Pine River SolarOther Β· 80.0 MW Β· agreement signed
- Onshore wind project J3909, Gratiot CountyOnshore wind Β· 175 MW Β· in study
- Solar project J3792, Gratiot CountySolar Β· 125 MW Β· in study
- Battery storage project J2026, Gratiot CountyBattery storage Β· 100 MW Β· in study
- Battery storage project J3268, Gratiot CountyBattery storage Β· 100 MW Β· in study
- Onshore wind project J533, Gratiot CountyOnshore wind Β· 200 MW Β· built
- Onshore wind project G905, Gratiot CountyOnshore wind Β· 200 MW Β· built
- Onshore wind project G934, Gratiot CountyOnshore wind Β· 150 MW Β· built
- Onshore wind project J589, Gratiot CountyOnshore wind Β· 149 MW Β· built
- Onshore wind project J132, Gratiot CountyOnshore wind Β· 125 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem