πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Missouri

BATTERY STORAGE Β· SPP

Battery storage project GEN-2018-121, Cass County

Battery storage project GEN-2018-121, Cass County is a 50.0 MW battery storage request withdrawn in the SPP interconnection queue, in Cass County, Missouri, connecting to GMO.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2018 (completed)
  2. Withdrawn / abandonedSep 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2018-121
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
GMO
Connection point (POI)
KC South-N. Raymore 161kV Line
Location
Cass County, Missouri
Technology
Battery: 50.0 MW
Total requested
50.0 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
21 November 2018
Proposed online date
December 2027
Withdrawn
September 2023

Location

Marker shows the centre of Cass County; the queue data does not give exact sites.

Power plants in Missouri Β· Transmission lines in Missouri

Other requests in Cass County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem