United States › Grid › Interconnection queues › Louisiana
SOLAR · MISOSolar project J683, West Baton Rouge Parish, La County
Solar project J683, West Baton Rouge Parish, La County is a 50.0 MW solar request built and operating in the MISO interconnection queue, in West Baton Rouge Parish, La County, Louisiana, connecting to Entergy.
Request details
- Queue ID
- J683
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- Entergy
- Connection point (POI)
- Wilbert - Livonia 138kV Substation (~1.5 mi from Wilbert)
- Location
- West Baton Rouge Parish, La County, Louisiana
- Technology
- Solar: 50.0 MW
- Total requested
- 50.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: In Service
- Queue status
- Operational
- Entered queue
- 11 July 2016
- Agreement signed
- 11 September 2018
- Proposed online date
- January 2020
- Came online
- January 2020
Location
Marker shows the centre of West Baton Rouge Parish, La County; the queue data does not give exact sites.
Other requests in West Baton Rouge Parish, La County
- Solar project J2729, West Baton Rouge Parish, La CountySolar · 200 MW · in study
- Solar project J1463, West Baton Rouge Parish, La CountySolar · 150 MW · withdrawn
- Solar project J961, West Baton Rouge Parish, La CountySolar · 150 MW · withdrawn
- Solar project J1539, West Baton Rouge Parish, La CountySolar · 146 MW · withdrawn
- Solar project J676, West Baton Rouge Parish, La CountySolar · 50.0 MW · withdrawn
- Solar project J639, West Baton Rouge Parish, La CountySolar · 50.0 MW · withdrawn
- Solar + storage project J1749, West Baton Rouge Parish, La CountySolar + storage · 50.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem