United States β€Ί Grid β€Ί Interconnection queues β€Ί Michigan

OTHER Β· MISO

Surplus; J202

Surplus; J202 is a 70.0 MW other request withdrawn in the MISO interconnection queue, in Tuscola County, Michigan, connecting to ITC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2021 (completed)
  2. Withdrawn / abandonedAug 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
S1007
Grid region
MISO (Midcontinent)
Utility / transmission owner
ITC
Connection point (POI)
Atlanta β€šΓ„Γ¬ Tuscola 120 kV line(265183)
Location
Tuscola County, Michigan
Technology
Solar: 70.0 MW Β· Other
Total requested
70.0 MW
Study phase
Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
8 July 2021
Proposed online date
October 2022
Withdrawn
August 2024

Location

Marker shows the centre of Tuscola County; the queue data does not give exact sites.

Power plants in Michigan Β· Transmission lines in Michigan

Other requests in Tuscola County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem