Solar + storage project 735, Baker County

Solar + storage project 735, Baker County is a 225 MW solar + storage request withdrawn in the West interconnection queue, in Baker County, Oregon, connecting to Idaho Power Company.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
735
Grid region
West (non-ISO utilities)
Utility / transmission owner
Idaho Power Company
Connection point (POI)
Quartz-North Powder-Brownlee 230kV
Location
Baker County, Oregon
Technology
Solar: 225 MW Β· Battery
Total requested
225 MW
Service type
NRIS and ERIS
Study phase
In Progress (unknown study)
Queue status
Withdrawn
Entered queue
20 September 2023
Proposed online date
January 2027

Location

Marker shows the centre of Baker County; the queue data does not give exact sites.

Power plants in Oregon Β· Transmission lines in Oregon

Other requests in Baker County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem