SOLAR + STORAGE Β· WESTSolar + storage project 735, Baker County
Solar + storage project 735, Baker County is a 225 MW solar + storage request withdrawn in the West interconnection queue, in Baker County, Oregon, connecting to Idaho Power Company.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2023 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 735
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- Idaho Power Company
- Connection point (POI)
- Quartz-North Powder-Brownlee 230kV
- Location
- Baker County, Oregon
- Technology
- Solar: 225 MW Β· Battery
- Total requested
- 225 MW
- Service type
- NRIS and ERIS
- Study phase
- In Progress (unknown study)
- Queue status
- Withdrawn
- Entered queue
- 20 September 2023
- Proposed online date
- January 2027
Location
Marker shows the centre of Baker County; the queue data does not give exact sites.
Other requests in Baker County
- Solar + storage project 732, Baker CountySolar + storage Β· 100 MW Β· agreement signed
- Other project 771, Baker CountyOther Β· 325 MW Β· in study
- Hydro project 757, Baker CountyHydro Β· 220 MW Β· built
- Solar project 519, Baker CountySolar Β· 15.0 MW Β· built
- Onshore wind project 403, Baker CountyOnshore wind Β· 10.0 MW Β· built
- Onshore wind project 402, Baker CountyOnshore wind Β· 10.0 MW Β· built
- Onshore wind project 401, Baker CountyOnshore wind Β· 10.0 MW Β· built
- Onshore wind project 404, Baker CountyOnshore wind Β· 10.0 MW Β· built
- Onshore wind project 405, Baker CountyOnshore wind Β· 10.0 MW Β· built
- Solar project 512, Baker CountySolar Β· 3.0 MW Β· built
- Onshore wind project 233, Baker CountyOnshore wind Β· 3.0 MW Β· built
- Other project 734, Baker CountyOther Β· 240 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem