United States β€Ί Grid β€Ί Interconnection queues β€Ί Montana

ONSHORE WIND Β· WEST

Onshore wind project 100-A, Big Horn County

Onshore wind project 100-A, Big Horn County is a 99.0 MW onshore wind request withdrawn in the West interconnection queue, in Big Horn County, Montana, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2006 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedJun 2008 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
100-A
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Developer
Gaelectric
Connection point (POI)
Yellowtail-Frannie line, Township 7 South, Range 25 East, MPM
Location
Big Horn County, Montana
Technology
Wind: 99.0 MW
Total requested
99.0 MW
Service type
Network resource (NRIS)
Study phase
IA signed 6/6/08, Suspended 6/24/08, IA Terminated 1/4/10
Queue status
Withdrawn
Entered queue
2 November 2006
Agreement signed
6 June 2008
Proposed online date
December 2008

Location

Marker shows the centre of Big Horn County; the queue data does not give exact sites.

Power plants in Montana Β· Transmission lines in Montana

Other requests in Big Horn County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem