United States › Grid › Interconnection queues › Louisiana
SOLAR · MISOSolar project J2737, Sabine Parish County
Solar project J2737, Sabine Parish County is a 180 MW solar request in interconnection study in the MISO interconnection queue, in Sabine Parish County, Louisiana.
Queue statusIn planning
- PlanningQueued Sep 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Sep 2026 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- J2737
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Sharing substation for J1890. POI for J1890 is not in the MTEP22 model yet. Reference bus A: 48904
- Location
- Sabine Parish County, Louisiana
- Technology
- Solar: 180 MW
- Total requested
- 180 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Active
- Entered queue
- 5 September 2025
- Proposed online date
- September 2026
Location
Marker shows the centre of Sabine Parish County; the queue data does not give exact sites.
Other requests in Sabine Parish County
- Solar project J1890, Sabine Parish CountySolar · 270 MW · in study
- Solar project J2180, Sabine Parish CountySolar · 250 MW · in study
- Solar project J1673, Sabine Parish CountySolar · 200 MW · in study
- Solar project J2920, Sabine Parish CountySolar · 92.0 MW · in study
- Solar project J3408, Sabine Parish CountySolar · 450 MW · withdrawn
- Battery storage project J3771, Sabine Parish CountyBattery storage · 200 MW · withdrawn
- Solar project J3612, Sabine Parish CountySolar · 200 MW · withdrawn
- Battery storage project J3585, Sabine Parish CountyBattery storage · 150 MW · withdrawn
- Battery storage project J2214, Sabine Parish CountyBattery storage · 62.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem