United States › Grid › Interconnection queues › Louisiana

SOLAR · MISO

Solar project J2920, Sabine Parish County

Solar project J2920, Sabine Parish County is a 92.0 MW solar request in interconnection study in the MISO interconnection queue, in Sabine Parish County, Louisiana.

Queue statusIn planning
  1. PlanningQueued Sep 2022 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2024 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
J2920
Grid region
MISO (Midcontinent)
Connection point (POI)
1673 Interconnection Substation
Location
Sabine Parish County, Louisiana
Technology
Solar: 92.0 MW
Total requested
92.0 MW
Service type
Energy only (ERIS)
Study phase
Study Phase: DPP 2; Post GIA Status: Not Started
Queue status
Active
Entered queue
15 September 2022
Proposed online date
December 2024

Location

Marker shows the centre of Sabine Parish County; the queue data does not give exact sites.

Power plants in Louisiana · Transmission lines in Louisiana

Other requests in Sabine Parish County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem