United States βΊ Grid βΊ Interconnection queues βΊ Louisiana
SOLAR + STORAGE Β· MISOSolar + storage project J3210, St. Tammany Parish County
Solar + storage project J3210, St. Tammany Parish County is a 100 MW solar + storage request withdrawn in the MISO interconnection queue, in St. Tammany Parish County, Louisiana, connecting to CLECO POWER.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedJul 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J3210
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- CLECO POWER
- Connection point (POI)
- J2245 Substation
- Location
- St. Tammany Parish County, Louisiana
- Technology
- Solar: 100 MW Β· Battery
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 13 September 2022
- Proposed online date
- September 2025
- Withdrawn
- July 2025
Location
Marker shows the centre of St. Tammany Parish County; the queue data does not give exact sites.
Power plants in Louisiana Β· Transmission lines in Louisiana
Other requests in St. Tammany Parish County
- Solar + storage project J2914, St. Tammany Parish CountySolar + storage Β· 450 MW Β· in study
- Solar + storage project J1674, St. Tammany Parish CountySolar + storage Β· 250 MW Β· withdrawn
- Solar project J464, St. Tammany Parish CountySolar Β· 200 MW Β· withdrawn
- Solar + storage project J1698, St. Tammany Parish CountySolar + storage Β· 150 MW Β· withdrawn
- Solar + storage project J2245, St. Tammany Parish CountySolar + storage Β· 100 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem