Niagara Grid I

Niagara Grid I is a 20.0 MW battery storage request withdrawn in the NYISO interconnection queue, in Erie County, New York, connecting to NM-NG.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2019 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
945
Grid region
NYISO (New York)
Utility / transmission owner
NM-NG
Developer
Niagara Grid I, LLC
Connection point (POI)
Huntley - Praxair 115 kV Line #47
Location
Erie County, New York
Technology
Battery: 20.0 MW
Total requested
20.0 MW
Queue status
Withdrawn
Entered queue
13 November 2019

Location

Marker shows the centre of Erie County; the queue data does not give exact sites.

Power plants in New York Β· Transmission lines in New York

Other requests in Erie County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem