United States › Grid › Interconnection queues › Florida
SOLAR · SOUTHEASTSolar project 235, Gadsden County
Solar project 235, Gadsden County is a 74.5 MW solar request built and operating in the Southeast interconnection queue, in Gadsden County, Florida, connecting to Duke Energy Florida.
Request details
- Queue ID
- 235
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Florida
- Developer
- Florida Renewable Partners, LLC
- Connection point (POI)
- Atwater Substation
- Location
- Gadsden County, Florida
- Technology
- Solar: 74.5 MW
- Total requested
- 74.5 MW
- Service type
- NRIS and ERIS
- Study phase
- IA Executed
- Queue status
- Operational
- Entered queue
- 17 July 2018
- Proposed online date
- November 2024
- Came online
- November 2024
Location
Marker shows the centre of Gadsden County; the queue data does not give exact sites.
Other requests in Gadsden County
- Solar project 236, Gadsden CountySolar · 74.5 MW · in study
- Solar project 425B, Gadsden CountySolar · 74.5 MW · in study
- Solar project 348B, Gadsden CountySolar · 74.5 MW · built
- Battery storage project 619, Gadsden CountyBattery storage · 150 MW · withdrawn
- Solar project 250, Gadsden CountySolar · 74.9 MW · withdrawn
- Solar project IC-714, Gadsden CountySolar · 74.5 MW · withdrawn
- Solar project 598, Gadsden CountySolar · 74.5 MW · withdrawn
- Solar project 251, Gadsden CountySolar · 74.5 MW · withdrawn
- Solar project 317, Gadsden CountySolar · 74.5 MW · withdrawn
- Other project 102, Quincy CountyOther · 59.0 MW · withdrawn
- Solar project IC-715, Gadsden CountySolar · 55.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem