United States βΊ Grid βΊ Interconnection queues βΊ Florida
OTHER Β· SOUTHEASTOther project 102, Quincy County
Other project 102, Quincy County is a 59.0 MW other request withdrawn in the Southeast interconnection queue, in Quincy County, Florida, connecting to Duke Energy Florida.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2009 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 102
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Florida
- Developer
- Masked
- Location
- Quincy County, Florida
- Technology
- Other: 59.0 MW
- Total requested
- 59.0 MW
- Queue status
- Withdrawn
- Entered queue
- 22 October 2009
- Proposed online date
- March 2012
Location
Marker shows the centre of Quincy County; the queue data does not give exact sites.
Other requests in Quincy County
- Solar project 236, Gadsden CountySolar Β· 74.5 MW Β· in study
- Solar project 425B, Gadsden CountySolar Β· 74.5 MW Β· in study
- Solar project 235, Gadsden CountySolar Β· 74.5 MW Β· built
- Solar project 348B, Gadsden CountySolar Β· 74.5 MW Β· built
- Battery storage project 619, Gadsden CountyBattery storage Β· 150 MW Β· withdrawn
- Solar project 250, Gadsden CountySolar Β· 74.9 MW Β· withdrawn
- Solar project IC-714, Gadsden CountySolar Β· 74.5 MW Β· withdrawn
- Solar project 598, Gadsden CountySolar Β· 74.5 MW Β· withdrawn
- Solar project 251, Gadsden CountySolar Β· 74.5 MW Β· withdrawn
- Solar project 317, Gadsden CountySolar Β· 74.5 MW Β· withdrawn
- Solar project IC-715, Gadsden CountySolar Β· 55.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem