United States βΊ Grid βΊ Interconnection queues βΊ North Dakota
COAL Β· WESTCoal project GI-0206, Adams County
Coal project GI-0206, Adams County is a 400 MW coal request withdrawn in the West interconnection queue, in Adams County, North Dakota, connecting to WAPA/BEPC/HCPD Integrated System.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2002 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GI-0206
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- WAPA/BEPC/HCPD Integrated System
- Connection point (POI)
- Hettinger
- Location
- Adams County, North Dakota
- Technology
- Coal: 400 MW
- Total requested
- 400 MW
- Study phase
- IAP
- Queue status
- Withdrawn
- Entered queue
- 30 April 2002
Location
Marker shows the centre of Adams County; the queue data does not give exact sites.
Power plants in North Dakota Β· Transmission lines in North Dakota
Other requests in Adams County
- Onshore wind project G752, Adams CountyOnshore wind Β· 150 MW Β· built
- Onshore wind project G751, Adams CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project G757, Adams CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project J218, Adams CountyOnshore wind Β· 150 MW Β· withdrawn
- Onshore wind project G781, Adams CountyOnshore wind Β· 150 MW Β· withdrawn
- Coal project GI-0205, Adams CountyCoal Β· 100 MW Β· withdrawn
- Onshore wind project GI-0706, Adams CountyOnshore wind Β· 48.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem