United States β€Ί Grid β€Ί Interconnection queues β€Ί Michigan

SOLAR + STORAGE Β· MISO

Solar + storage project J3769, Saginaw County

Solar + storage project J3769, Saginaw County is a 250 MW solar + storage request withdrawn in the MISO interconnection queue, in Saginaw County, Michigan, connecting to WOLVERINE POWER SUPPLY COOPERATIVE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2024 (completed)
  2. Withdrawn / abandonedDec 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J3769
Grid region
MISO (Midcontinent)
Utility / transmission owner
WOLVERINE POWER SUPPLY COOPERATIVE
Connection point (POI)
MURPHY - NELSON ROAD 345.0kV
Location
Saginaw County, Michigan
Technology
Solar: 250 MW Β· Battery
Total requested
250 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 1
Queue status
Withdrawn
Entered queue
17 April 2024
Proposed online date
August 2028
Withdrawn
December 2025

Location

Marker shows the centre of Saginaw County; the queue data does not give exact sites.

Power plants in Michigan Β· Transmission lines in Michigan

Other requests in Saginaw County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem