ONSHORE WIND Β· MISO

Onshore wind project G450, Rolette County

Onshore wind project G450, Rolette County is a 1.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Rolette County, North Dakota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2004 (completed)
  2. Withdrawn / abandonedSep 2004 (project stopped here)
  3. ConsentedSep 2004 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G450
Grid region
MISO (Midcontinent)
Connection point (POI)
Unknown
Location
Rolette County, North Dakota
Technology
Wind: 1.0 MW
Total requested
1.0 MW
Queue status
Withdrawn
Entered queue
13 August 2004
Agreement signed
27 September 2004
Proposed online date
November 2006
Withdrawn
September 2004

Location

Marker shows the centre of Rolette County; the queue data does not give exact sites.

Power plants in North Dakota Β· Transmission lines in North Dakota

Other requests in Rolette County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem