πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Wyoming

ONSHORE WIND Β· WEST

Onshore wind project 290, Sweetwater County

Onshore wind project 290, Sweetwater County is a 101 MW onshore wind request withdrawn in the West interconnection queue, in Sweetwater County, Wyoming, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2009 (completed)
  2. Withdrawn / abandonedJun 2020 (project stopped here)
  3. ConsentedJun 2020 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
290
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Developer
Sweeney Ranch Wind Park, LLC
Connection point (POI)
Rock Springs-Point of Rocks line
Location
Sweetwater County, Wyoming
Technology
Wind: 101 MW
Total requested
101 MW
Service type
Energy only (ERIS)
Study phase
IA signed May 31, 2011, Terminated 6/23/2020
Queue status
Withdrawn
Entered queue
22 September 2009
Agreement signed
23 June 2020
Proposed online date
September 2022
Withdrawn
June 2020

Location

Marker shows the centre of Sweetwater County; the queue data does not give exact sites.

Power plants in Wyoming Β· Transmission lines in Wyoming

Other requests in Sweetwater County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem