BATTERY STORAGE Β· MISO

Battery storage project J3647, Gratiot County

Battery storage project J3647, Gratiot County is a 220 MW battery storage request withdrawn in the MISO interconnection queue, in Gratiot County, Michigan, connecting to METC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2024 (completed)
  2. Withdrawn / abandonedSep 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J3647
Grid region
MISO (Midcontinent)
Utility / transmission owner
METC
Connection point (POI)
NELSON ROAD
Location
Gratiot County, Michigan
Technology
Battery: 220 MW
Total requested
220 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 1
Queue status
Withdrawn
Entered queue
15 April 2024
Proposed online date
November 2028
Withdrawn
September 2025

Location

Marker shows the centre of Gratiot County; the queue data does not give exact sites.

Power plants in Michigan Β· Transmission lines in Michigan

Other requests in Gratiot County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem