Solar project GEN-2019-015, Atoka County is a 72.6 MW solar request withdrawn in the SPP interconnection queue, in Atoka County, Oklahoma.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2019 (completed)
- Withdrawn / abandonedMay 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2019-015
- Grid region
- SPP (Southwest Power Pool)
- Connection point (POI)
- 138kV Atoka substation
- Location
- Atoka County, Oklahoma
- Technology
- Solar: 72.6 MW
- Total requested
- 72.6 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 24 April 2019
- Proposed online date
- December 2024
- Withdrawn
- May 2020
Location
Marker shows the centre of Atoka County; the queue data does not give exact sites.
Other requests in Atoka County
- Solar project GEN-2024-316, Atoka CountySolar Β· 300 MW Β· in study
- Battery storage project GEN-2024-184, Atoka CountyBattery storage Β· 199 MW Β· in study
- Solar + storage project GEN-2023-069, Atoka CountySolar + storage Β· 100 MW Β· in study
- Solar + storage project GEN-2023-070, Atoka CountySolar + storage Β· 50.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem