United States › Grid › Interconnection queues › Florida
SOLAR · SOUTHEASTSolar project 149, Highlands County
Solar project 149, Highlands County is a 45.0 MW solar request built and operating in the Southeast interconnection queue, in Highlands County, Florida, connecting to Duke Energy Florida.
Request details
- Queue ID
- 149
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Florida
- Developer
- Duke Energy Florida, LLC
- Connection point (POI)
- Lake Placid Substation
- Location
- Highlands County, Florida
- Technology
- Solar: 45.0 MW
- Total requested
- 45.0 MW
- Service type
- NRIS and ERIS
- Study phase
- IA Executed
- Queue status
- Operational
- Entered queue
- 7 June 2016
- Proposed online date
- December 2019
- Came online
- November 2019
Location
Marker shows the centre of Highlands County; the queue data does not give exact sites.
Other requests in Highlands County
- Solar project 259, Highlands CountySolar · 74.9 MW · under construction
- Solar project 258, Highlands CountySolar · 74.9 MW · under construction
- Battery storage project FC100008, Highlands CountyBattery storage · 100 MW · in study
- Solar project 478, Highlands CountySolar · 74.5 MW · in study
- Solar project 177, Highlands CountySolar · 74.9 MW · withdrawn
- Solar project 256, Highlands CountySolar · 74.9 MW · withdrawn
- Solar project 257, Highlands CountySolar · 74.9 MW · withdrawn
- Solar project 138C, Highlands CountySolar · 74.9 MW · withdrawn
- Solar project FC100005, Highlands CountySolar · 74.9 MW · withdrawn
- Solar project 175, Highlands CountySolar · 74.9 MW · withdrawn
- Solar project 304, Highlands CountySolar · 74.9 MW · withdrawn
- Solar project 304A, Highlands CountySolar · 74.9 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem