πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί California

SOLAR Β· WEST

Solar project 2015-G1, Merced County

Solar project 2015-G1, Merced County is a 26.0 MW solar request withdrawn in the West interconnection queue, in Merced County, California, connecting to WAPA Sierra Nevada.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2015 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
2015-G1
Grid region
West (non-ISO utilities)
Utility / transmission owner
WAPA Sierra Nevada
Connection point (POI)
O'Neill 70 kV Substation
Location
Merced County, California
Technology
Solar: 26.0 MW
Total requested
26.0 MW
Study phase
Mutual agreement to withdraw due to no feasible interconnection solution at O'Neil Sub.
Queue status
Withdrawn
Entered queue
26 January 2015
Proposed online date
October 2020

Location

Marker shows the centre of Merced County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Merced County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem