United States βΊ Grid βΊ Interconnection queues βΊ Ohio
SOLAR Β· PJMClinton Solar
Clinton Solar is a 49.9 MW solar request built and operating in the PJM interconnection queue, in Clinton County, Ohio, connecting to Dayton.
Request details
- Queue ID
- AD2-031
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dayton
- Connection point (POI)
- Martinsville-Wilmington 69 kV
- Location
- Clinton County, Ohio
- Technology
- Solar: 49.9 MW
- Total requested
- 49.9 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Operational
- Entered queue
- 16 December 2017
- Proposed online date
- June 2025
- Came online
- June 2025
Location
Marker shows the centre of Clinton County; the queue data does not give exact sites.
Other requests in Clinton County
- Yellow Wood Solar Energy CenterSolar Β· 300 MW Β· agreement signed
- Clinton County Energy Storage ProjectBattery storage Β· 6.0 MW Β· built
- Clinton County Energy Storage ProjectBattery storage Β· 4.0 MW Β· built
- Battery storage project AF2-113, Clinton CountyBattery storage Β· 75.0 MW Β· withdrawn
- Solar project AD1-147, Clinton CountySolar Β· 50.0 MW Β· withdrawn
- Solar project V3-013, Clinton CountySolar Β· 20.0 MW Β· withdrawn
- Solar project W4-035, Clinton CountySolar Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem