Clinton Solar

Clinton Solar is a 49.9 MW solar request built and operating in the PJM interconnection queue, in Clinton County, Ohio, connecting to Dayton.

Queue statusOperating
  1. PlanningQueued Dec 2017 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingJun 2025 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
AD2-031
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
Dayton
Connection point (POI)
Martinsville-Wilmington 69 kV
Location
Clinton County, Ohio
Technology
Solar: 49.9 MW
Total requested
49.9 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
Queue status
Operational
Entered queue
16 December 2017
Proposed online date
June 2025
Came online
June 2025

Location

Marker shows the centre of Clinton County; the queue data does not give exact sites.

Power plants in Ohio Β· Transmission lines in Ohio

Other requests in Clinton County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem