Solar project V3-013, Clinton County is a 20.0 MW solar request withdrawn in the PJM interconnection queue, in Clinton County, Ohio, connecting to Dayton.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2009 (completed)
- Withdrawn / abandonedOct 2011 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- V3-013
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dayton
- Connection point (POI)
- Wilmington 69kV
- Location
- Clinton County, Ohio
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 18 August 2009
- Proposed online date
- December 2015
- Withdrawn
- October 2011
Location
Marker shows the centre of Clinton County; the queue data does not give exact sites.
Other requests in Clinton County
- Yellow Wood Solar Energy CenterSolar Β· 300 MW Β· agreement signed
- Clinton SolarSolar Β· 49.9 MW Β· built
- Clinton County Energy Storage ProjectBattery storage Β· 6.0 MW Β· built
- Clinton County Energy Storage ProjectBattery storage Β· 4.0 MW Β· built
- Battery storage project AF2-113, Clinton CountyBattery storage Β· 75.0 MW Β· withdrawn
- Solar project AD1-147, Clinton CountySolar Β· 50.0 MW Β· withdrawn
- Solar project W4-035, Clinton CountySolar Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem