United States β€Ί Grid β€Ί Interconnection queues β€Ί Arkansas

SOLAR Β· MISO

Solar project J3599, Craighead County

Solar project J3599, Craighead County is a 60.0 MW solar request withdrawn in the MISO interconnection queue, in Craighead County, Arkansas, connecting to ARKANSAS ELECTRIC COOPERATIVE CORPORATION.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2024 (completed)
  2. Withdrawn / abandonedSep 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J3599
Grid region
MISO (Midcontinent)
Utility / transmission owner
ARKANSAS ELECTRIC COOPERATIVE CORPORATION
Connection point (POI)
Lunsford
Location
Craighead County, Arkansas
Technology
Solar: 60.0 MW
Total requested
60.0 MW
Service type
Energy only (ERIS)
Study phase
Study Phase: DPP 1
Queue status
Withdrawn
Entered queue
10 April 2024
Proposed online date
June 2027
Withdrawn
September 2025

Location

Marker shows the centre of Craighead County; the queue data does not give exact sites.

Power plants in Arkansas Β· Transmission lines in Arkansas

Other requests in Craighead County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem