Solar + storage project G0736, Asotin County

Solar + storage project G0736, Asotin County is a 600 MW solar + storage request withdrawn in the West interconnection queue, in Asotin County, Washington.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2022 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G0736
Grid region
West (non-ISO utilities)
Connection point (POI)
Tucannon River - North Lewiston No 1 115 kV line.
Location
Asotin County, Washington
Technology
Solar: 300 MW Β· Battery: 300 MW
Total requested
600 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
21 March 2022
Proposed online date
December 2025

Location

Marker shows the centre of Asotin County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Asotin County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem