United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

SOLAR + STORAGE Β· WEST

Solar + storage project C2-41, Asotin County

Solar + storage project C2-41, Asotin County is a 160 MW solar + storage request withdrawn in the West interconnection queue, in Asotin County, Washington, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2022 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
C2-41
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Connection point (POI)
Talbot substation
Location
Asotin County, Washington
Technology
Solar: 160 MW Β· Battery
Total requested
160 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
28 April 2022
Proposed online date
December 2025

Location

Marker shows the centre of Asotin County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Asotin County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem