πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί South Dakota

ONSHORE WIND Β· MISO

Onshore wind project G878, Turner County

Onshore wind project G878, Turner County is a 150 MW onshore wind request withdrawn in the MISO interconnection queue, in Turner County, South Dakota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2007 (completed)
  2. Withdrawn / abandonedMay 2010 (project stopped here)
  3. ConsentedMay 2010 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G878
Grid region
MISO (Midcontinent)
Connection point (POI)
Xcel Grant 115 kV substation
Location
Turner County, South Dakota
Technology
Wind: 150 MW
Total requested
150 MW
Study phase
SPA - SIS
Queue status
Withdrawn
Entered queue
9 October 2007
Agreement signed
12 May 2010
Proposed online date
March 2008
Withdrawn
May 2010

Location

Marker shows the centre of Turner County; the queue data does not give exact sites.

Power plants in South Dakota Β· Transmission lines in South Dakota

Other requests in Turner County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem