United States › Grid › Interconnection queues › Indiana

ONSHORE WIND · PJM

Wells County Wind Farm

Wells County Wind Farm is a 300 MW onshore wind request withdrawn in the PJM interconnection queue, in Wells County, Indiana, connecting to AEP.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2009 (completed)
  2. Withdrawn / abandonedApr 2018 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
V3-015
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Keystone 345kV
Location
Wells County, Indiana
Technology
Wind: 300 MW
Total requested
300 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Withdrawn
Entered queue
24 August 2009
Proposed online date
December 2014
Withdrawn
April 2018

Location

Marker shows the centre of Wells County; the queue data does not give exact sites.

Power plants in Indiana · Transmission lines in Indiana

Other requests in Wells County