United States βΊ Grid βΊ Interconnection queues βΊ Illinois
BATTERY STORAGE Β· PJMBattery storage project AF2-329, Kendall County
Battery storage project AF2-329, Kendall County is a 42.2 MW battery storage request withdrawn in the PJM interconnection queue, in Kendall County, Illinois, connecting to ComEd.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2020 (completed)
- Withdrawn / abandonedJan 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AF2-329
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ComEd
- Developer
- Plano Skies Energy Center, LLC
- Connection point (POI)
- Sandwich-Plano 138 kV
- Location
- Kendall County, Illinois
- Technology
- Battery: 42.2 MW
- Total requested
- 42.2 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 30 March 2020
- Proposed online date
- December 2023
- Withdrawn
- January 2025
Location
Marker shows the centre of Kendall County; the queue data does not give exact sites.
Other requests in Kendall County
- Solar project AG2-453, Kendall CountySolar Β· 280 MW Β· in study
- Solar + storage project AH2-258, Kendall CountySolar + storage Β· 172 MW Β· in study
- Battery storage project AH2-259, Kendall CountyBattery storage Β· 172 MW Β· in study
- Plano Skies Energy CenterSolar Β· 150 MW Β· in study
- Plano Skies Energy CenterSolar Β· 100 MW Β· in study
- Solar project AI1-119, Kendall CountySolar Β· 28.8 MW Β· in study
- Gas project V1-022, Kendall CountyGas Β· 380 MW Β· withdrawn
- Battery storage project AE2-340, Kendall CountyBattery storage Β· 209 MW Β· withdrawn
- Gas project AB2-154, Kendall CountyGas Β· 65.0 MW Β· withdrawn
- Solar + storage project AF2-034, Kendall CountySolar + storage Β· 20.0 MW Β· withdrawn
- Gas project AA2-136, Kendall CountyGas Β· 10.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem